+
  • 57cefaa6-5180-42d7-ab29-1609023956ab (1).jpg

HBT9050CH-5M


Curb weight:

Applicable scene:

图片名称

Earthworks

图片名称

Highway

图片名称

Mine

图片名称

Transportation


Messages

Product Details


12 hours of uninterrupted continuous pump, 31 pump can still have succeeded in carrying out an assignment;

60000 party concrete pouring completed within 60 hours;

B90, C150, three graded concrete difficult to deal with easily;

Sludge, slag, waste can also be pumped;

Fault self diagnosis technology, every moment insight into the state of equipment, real-time monitoring and diagnosis of more than 50 faults, can effectively shorten the 70% exhaust time, save time for you worry;

Dedicated motion controller, the use of dedicated pump motion controller, integrated pumping classic algorithm and function library, faster operation, superior performance, and pump operating conditions perfect fusion.

Solutions for your industry, ready for your choice

Submit